Skip to content
  • BAL2194 – EFI

    PFP Pegasus Fire Protection

    PFP Pegasus Fire Protection


    0131 453 3388

    Job Applications
    • Home
    • Services
      • Taping and Decoration
      • Steel Framing system
      • Ceilings
      • Drylining
    • Portfolio
    • Contact Us

    Edinburgh Futures Institute

    The Edinburgh Futures Institute was a significant undertaking to transform the historic Edinburgh royal infirmary into an interdisciplinary learning and research building for the university of Edinburgh. Care was taken through out the project to preserve the beautiful architecture while adding a modern touch with the centre piece being the beautifully restored clock tower.

    Throughout Edinburgh Futures Institute project PFP have installed woodwool to all exterior walls covering 11,500m2, woodwool was chosen as a material as it was suitable for plastering directly on the board without preparation being needed. PFP also installed various acoustic rafts throughout the project to help with sound quality and reduce echoes caused by the high ceilings.

    project information

    • Clients Name: Balfour Beatty
    • Size of The Contract: £4.6M
    • Sector: Education, Specialist refurbishment
    • Duration of the project: 108 weeks
    • Services provided: Partitions and Ceilings

    PFP Pegasus Fire Protection

    25A Bankhead Dr,
    Edinburgh EH11 4DN
    United Kingdom

    Proudly powered by WordPress

    Pages

    • Home
    • Services
      • Taping and Decoration
      • Steel Framing system
      • Ceilings
      • Drylining
    • Portfolio
    • Contact Us

    Privacy Policy

    16/02/2026
  • KIE2017 – Citizens theatre

    PFP Pegasus Fire Protection

    PFP Pegasus Fire Protection


    0131 453 3388

    Job Applications
    • Home
    • Services
      • Taping and Decoration
      • Steel Framing system
      • Ceilings
      • Drylining
    • Portfolio
    • Contact Us

    Citizens theatre

    Citizen’s theatre was a beautiful Victorian auditorium that had fallen into disrepair over the years after the building began life as a working theatre in 1878. To bring life back to the historic building a comprehensive redevelopment of the building was undertaken.

    Through the redevelopment of the building care was taken to preserve the original Victorian auditorium while creating new welcoming social space. The redevelopment of the building has improved the sustainability of the building and future-proofed the amazing landmark.

    project information

    • Clients Name: Kier Construction Ltd 
    • Size of The Contract: £1.7M
    • Sector: Leisure, Specialist Refurbishment
    • Duration of the project: 126 weeks
    • Services provided: Partitions and Ceilings

    PFP Pegasus Fire Protection

    25A Bankhead Dr,
    Edinburgh EH11 4DN
    United Kingdom

    Proudly powered by WordPress

    Pages

    • Home
    • Services
      • Taping and Decoration
      • Steel Framing system
      • Ceilings
      • Drylining
    • Portfolio
    • Contact Us

    Privacy Policy

    16/02/2026
  • PFP2003 – Allen court

    PFP Pegasus Fire Protection

    PFP Pegasus Fire Protection


    0131 453 3388

    Job Applications
    • Home
    • Services
      • Taping and Decoration
      • Steel Framing system
      • Ceilings
      • Drylining
    • Portfolio
    • Contact Us

    Allen court

    Allen court was a new experience for PFP as this was the first job whare PFP performed the role of a main contractor performing a full strip out and fit out of a beautiful historic location within fife. The building had a long and rich history of printing works dating back to 1878 and finally closing its doors in 2007 as the business was no longer sustainable due to the quick advancements in technology at the time.

    To bring this building into the twenty first century, the interior was converted into 26 luxury residential properties, each of which are unique in nature. The little alcoves and idiosyncrasies of the building have been kept and incorporated into the new living spaces. The high ceilings and large factory windows have been retained giving the accommodation wonderful ceiling heights and an abundance of natural light.

    The building has not only been brought to life inside but has been lovingly and sympathetically restored outside. The original stonework has either been re-pointed or moved from its original location to form new structures on the site. Both inside and out great care has been taken to retain the wonderful character and history of the building.

    project information

    • Clients Name: Pegasus Fire Protection company Ltd.
    • Size of The Contract: £4.2M
    • Sector: Residential, Specialist refurbishment
    • Duration of the project: 252 weeks
    • Services provided: Partitions, Ceilings, taping and decoration

    PFP Pegasus Fire Protection

    25A Bankhead Dr,
    Edinburgh EH11 4DN
    United Kingdom

    Proudly powered by WordPress

    Pages

    • Home
    • Services
      • Taping and Decoration
      • Steel Framing system
      • Ceilings
      • Drylining
    • Portfolio
    • Contact Us

    Privacy Policy

    16/02/2026