Skip to content
  • DAN2001 – City wharf

    PFP Pegasus Fire Protection

    PFP Pegasus Fire Protection


    0131 453 3388

    Job Applications
    • Home
    • Services
      • Taping and Decoration
      • Steel Framing system
      • Ceilings
      • Drylining
    • Portfolio
    • Contact Us

    City wharf development

    The City Wharf development is a high-rise purpose-built student accommodation offering a diverse range of living options, from en-suite bedrooms with shared kitchen and communal living facilities to premium self-contained studio apartments. The development also features an extensive selection of communal amenities, including a fully equipped gym, cinema lounge, games hub, co-working spaces, and a dedicated library, providing residents with a well-rounded living experience. A key feature of the development is its panoramic views across the River Clyde, complemented by its prime central location, which offers convenient access to Glasgow’s universities, colleges, and the wider city centre.

    Project Information

    • Clients Name: Dandara
    • Size of The Contract: £3.2M
    • Sector: Residential
    • Duration of the Project: 65 weeks
    • Services Provided: Partitions, Ceilings, Ames Taping and Decoration

    PFP Pegasus Fire Protection

    25A Bankhead Dr,
    Edinburgh EH11 4DN
    United Kingdom

    Proudly powered by WordPress

    Pages

    • Home
    • Services
      • Taping and Decoration
      • Steel Framing system
      • Ceilings
      • Drylining
    • Portfolio
    • Contact Us

    Privacy Policy

    30/07/2026
  • GRA2004 – Bonnington road

    PFP Pegasus Fire Protection

    PFP Pegasus Fire Protection


    0131 453 3388

    Job Applications
    • Home
    • Services
      • Taping and Decoration
      • Steel Framing system
      • Ceilings
      • Drylining
    • Portfolio
    • Contact Us

    Bonnington road

    Bonnington road was a large project covering three multi-story apartment buildings which totalled 460 apartments with various other amenities like a gym, co-working space and rooftop terrace. For PFP this job was large undertaking with both partitions and ceilings packages being handled primarily by PFP with the addition of ames taping and decoration packages beginning and being handled by PFP as the project progressed.

    This project brings much needed rental properties to the Scottish capital while also revitalizing an older area of Edinburgh with a new modern design. Through out the project PFP have installed more than 290,000 m2 of plaster board across all 3 buildings used for both walls and ceilings. Due to the large amounts of plasterboard being installed, plaster board waste became the biggest challenge for PFP. To combat this we undertook full plasterboard recycling with waste skips being swapped weekly to ensure that housekeeping standards were upheld and waste materials were not building up.  

    project information

    • Clients Name: John Graham Construction Limited
    • Size of The Contract: £9.8M
    • Sector: Residential
    • Duration of the project: 85.5 weeks
    • Services provided: Partitions, Ceilings, taping and decoration

    PFP Pegasus Fire Protection

    25A Bankhead Dr,
    Edinburgh EH11 4DN
    United Kingdom

    Proudly powered by WordPress

    Pages

    • Home
    • Services
      • Taping and Decoration
      • Steel Framing system
      • Ceilings
      • Drylining
    • Portfolio
    • Contact Us

    Privacy Policy

    16/02/2026
  • GRA2003 – Montrose terrace

    PFP Pegasus Fire Protection

    PFP Pegasus Fire Protection


    0131 453 3388

    Job Applications
    • Home
    • Services
      • Taping and Decoration
      • Steel Framing system
      • Ceilings
      • Drylining
    • Portfolio
    • Contact Us

    Montrose Terrace

    Montrose terrace project located in a corner plot on Montrose Terrace and West Norton Place in Edinburgh’s Abbeyhill area brings much needed high quality student accommodation with Edinburgh’s growing student population. The project provided 149 high quality students studios and cluster flats with a range of amenities for example the gym and rooftop dining area. Care was taken through out the project to match the appearance of the building that originally stood there and the surrounding buildings while also giving the building a few modern touches to enhance the outer appearance of the building.

    project information

    • Clients Name: John Graham Construction Limited
    • Size of The Contract: £1.1M
    • Sector: Residential
    • Duration of the project: 49.5 weeks
    • Services provided: Partitions and Ceilings

    PFP Pegasus Fire Protection

    25A Bankhead Dr,
    Edinburgh EH11 4DN
    United Kingdom

    Proudly powered by WordPress

    Pages

    • Home
    • Services
      • Taping and Decoration
      • Steel Framing system
      • Ceilings
      • Drylining
    • Portfolio
    • Contact Us

    Privacy Policy

    16/02/2026
  • CLA2030 – Mayfield road

    PFP Pegasus Fire Protection

    PFP Pegasus Fire Protection


    0131 453 3388

    Job Applications
    • Home
    • Services
      • Taping and Decoration
      • Steel Framing system
      • Ceilings
      • Drylining
    • Portfolio
    • Contact Us

    Mayfield

    The Mayfield Road project was split into 2 phases; in each phase of the construction a modular five-story student accommodation building was constructed. Between these two buildings there are 257 rooms available to house students this is a prime location for students located directly opposite the university of Edinburgh’s king’s buildings campus.

    One of the challenges faced was storage of materials and plant interface Due to the lacking space around the building a 150-meter stretch of the main road was enclosed within the site to use for material lay down when delivering to site. All materials had to be taken into and stored within the building. Through out the building PFP have installed a range of British gypsum partitions and suspended ceilings additionally tile and grid ceilings were installed in corridors and halls.

    project information

    • Clients Name: Clark Contracts
    • Size of The Contract: £578k
    • Sector: Residential
    • Duration of the project: 22.5 weeks
    • Services provided: Partitions, Ceilings, taping and decoration

    PFP Pegasus Fire Protection

    25A Bankhead Dr,
    Edinburgh EH11 4DN
    United Kingdom

    Proudly powered by WordPress

    Pages

    • Home
    • Services
      • Taping and Decoration
      • Steel Framing system
      • Ceilings
      • Drylining
    • Portfolio
    • Contact Us

    Privacy Policy

    16/02/2026
  • PFP2003 – Allen court

    PFP Pegasus Fire Protection

    PFP Pegasus Fire Protection


    0131 453 3388

    Job Applications
    • Home
    • Services
      • Taping and Decoration
      • Steel Framing system
      • Ceilings
      • Drylining
    • Portfolio
    • Contact Us

    Allen court

    Allen court was a new experience for PFP as this was the first job whare PFP performed the role of a main contractor performing a full strip out and fit out of a beautiful historic location within fife. The building had a long and rich history of printing works dating back to 1878 and finally closing its doors in 2007 as the business was no longer sustainable due to the quick advancements in technology at the time.

    To bring this building into the twenty first century, the interior was converted into 26 luxury residential properties, each of which are unique in nature. The little alcoves and idiosyncrasies of the building have been kept and incorporated into the new living spaces. The high ceilings and large factory windows have been retained giving the accommodation wonderful ceiling heights and an abundance of natural light.

    The building has not only been brought to life inside but has been lovingly and sympathetically restored outside. The original stonework has either been re-pointed or moved from its original location to form new structures on the site. Both inside and out great care has been taken to retain the wonderful character and history of the building.

    project information

    • Clients Name: Pegasus Fire Protection company Ltd.
    • Size of The Contract: £4.2M
    • Sector: Residential, Specialist refurbishment
    • Duration of the project: 252 weeks
    • Services provided: Partitions, Ceilings, taping and decoration

    PFP Pegasus Fire Protection

    25A Bankhead Dr,
    Edinburgh EH11 4DN
    United Kingdom

    Proudly powered by WordPress

    Pages

    • Home
    • Services
      • Taping and Decoration
      • Steel Framing system
      • Ceilings
      • Drylining
    • Portfolio
    • Contact Us

    Privacy Policy

    16/02/2026