Mayfield

The Mayfield Road project was split into 2 phases; in each phase of the construction a modular five-story student accommodation building was constructed. Between these two buildings there are 257 rooms available to house students this is a prime location for students located directly opposite the university of Edinburgh’s king’s buildings campus.
One of the challenges faced was storage of materials and plant interface Due to the lacking space around the building a 150-meter stretch of the main road was enclosed within the site to use for material lay down when delivering to site. All materials had to be taken into and stored within the building. Through out the building PFP have installed a range of British gypsum partitions and suspended ceilings additionally tile and grid ceilings were installed in corridors and halls.
project information
- Clients Name: Clark Contracts
- Size of The Contract: £578k
- Sector: Residential
- Duration of the project: 22.5 weeks
- Services provided: Partitions, Ceilings, taping and decoration






PFP Pegasus Fire Protection
25A Bankhead Dr,
Edinburgh EH11 4DN
United Kingdom
Proudly powered by WordPress
Pages